Over the past year or so I have been rewiring the remote controls at our transmitter sites to clean up old wiring and give us more useful status and control from the sites. I had completed most of them but six sites remained. This week I set out to finish Sundance and Newcastle. At the […]
Over the past couple of days I had been receiving reports of extremely high temperatures at a site again…This time from Gillette…I decided to make the trip up to the site to check it out. Arrived on site in UW88…
The same weekend I had issues with ice in Rock Springs, we also had issues with ice at our Pilot Hill transmitter site in Laramie. I certainly had never encountered ice this severe, and apparently neither had our General Manager. Our main transmitter had folded back to approximately 18%. The other transmitters were all folding […]
This weekend I received reports of high temperatures at our Rock Springs site. I found this extremely strange since it was actually quite cold outside and snowing…The 100+ degree temperatures were actually causing equipment to shut down. Since UW88 was in the shop, I loaded my truck and headed for the site. Made it to […]
About a year ago we installed a dish at our Rawlins translator to replace an unreliable over-the-air feed from Laramie. The mounting pole for the old dish was not quite as stable as it should have been. In addition the dish was damaged over the winter and needed to be replaced. We decided to install a […]