Reid and I have been going around to various transmitter sites doing some re-wiring.  This wiring will allow us much better monitoring and control of the transmitter sites.  The first sites that we re-wired were Laramie and Jackson.  Gillette was next up.  Not for any particular reason, but we happened to be going that direction…

The site was a bit muddy at the time so we used a tracked vehicle called an “Argo” to gain access.  We had rented this vehicle for a couple of weeks and it proved to be an extremely valuable resource.  I hope to purchase one at some point.  There were very few cases where (even in the midst of heavy winter snow) it couldn’t get us in.

The Argo in front of the building.  Mud was the issue at this site rather than snow…


Me with the finished equipment rack

More pictures from the project…