Everything is installed in the equipment building and ready for testing. I took a few pictures of the site in ‘test’ mode.
The transmitter and equipment rack…Everything is up and running!
Modulation monitor, satellite receiver and audio processor
My radio “studio” for testing…A small mixer and my iPod provide the audio source for the transmitter…
This punch block is for various “housekeeping” alarms such as cooling failure, high/low temp, door alarm, fire/smoke, etc.
A network switch connects all of the various equipment at the site.
Posing with the transmitter and equipment rack
No user commented in " Day 5–Finishing the building "
Follow-up comment rss or Leave a